Sunday, May 11, 2008

Construction and garden

The porch and steps into the VIP kuti are now done. The porch, covered, is approx. 6'X8' with a set of steps from the ground to the porch and another set from the porch into the kuti. The roof was a bit difficult given that the existing roof on the kuti is a very step angle thus not allowing a continuation of that angle for the porch roof. The level of the porch had to drop by nearly 2 feet to give the needed head room. The rafters for the porch are bolted to the main roof rafters and are also strapped to the kuti walls. All in all a sound and strong system if not the prettiest.

In the garden the strawberries seem to be making it and I am waiting for the first planting of lettuce, onions, carrots and radishes to come up. We have been having a few days in the 70's alternating with days in the 50's. I have had to cover a few nights as we are still getting some freezing temps. I will put out the first round of plants, that have been started inside, this next week. Temps are projected to be in the low 80's by weeks end with over night temps staying in the low 40's.

Most all of the 110 trees/shrubs that were planted this spring are showing signs of life and many of last years plantings as well. It will be another week or two before it's possible to know for sure who will make it and who won't.

Brian will arrive late Thursday to help with the 2008 building season. We have some very ambitious plans for this year. Finish the VIP and add four smaller kutis. Install a central bath and kitchen facility and run electricity to the shop/bath/kitchen building and on to the VIP kuti. The electricity will require digging about 800 feet of trench to bury the lines. I have a backhoe so that should be mostly machine work.

No comments: