Saturday, October 18, 2008
501C3
Well the IRS finally came through. Talked with the IRS representative on thursday, last, and she said we had been approved.
Sunday, October 12, 2008
Winter is nearly here.
All three meditators are now in full retreat.
Brian was here for a few days and helped with some electrical work and with the well.
We still have great water and more of it than the neighbors do but the water table is down from the 5 year drought.
I am now working on building a Sauna which can also double as a residence if need be.
We have two Monks scheduled to arrive the first week of December.
All paper work has been corrected and returned to the IRS for the 501C3. We hope to hear from them shortly.
It has been a very busy season but we did manage to get done what we wanted to get done. MOSTLY!
In the next month or so I will be posting the preliminary figures on volunteer hours worked and yogi meditation days/weeks/months for this year to date.
Thanks to all of you who have helped by working, donating and sending metta.
Roger
Brian was here for a few days and helped with some electrical work and with the well.
We still have great water and more of it than the neighbors do but the water table is down from the 5 year drought.
I am now working on building a Sauna which can also double as a residence if need be.
We have two Monks scheduled to arrive the first week of December.
All paper work has been corrected and returned to the IRS for the 501C3. We hope to hear from them shortly.
It has been a very busy season but we did manage to get done what we wanted to get done. MOSTLY!
In the next month or so I will be posting the preliminary figures on volunteer hours worked and yogi meditation days/weeks/months for this year to date.
Thanks to all of you who have helped by working, donating and sending metta.
Roger
Thursday, September 18, 2008
number 1 is done for now


We have gone as far as we are going this season with number 1 shot gun shack. Number two and three will get a little more work but they will not be finished to the extent number is until next season. Pictures are of Mischa and Brendon inside number 1. Terran has now moved in and continues the retreat he started last month in the VIP Kuti.
We are now working on the central kitchen and bath facility. Pictures of it will follow in several days.
Brian is expected to arrive tomorrow for a weeks visit.
Friday, September 5, 2008
Monday, September 1, 2008
winding down for the season
Our three meditators, who will be with us for the winter, are moving into their respective cabins over the next few days. We have been doing cosmetic work and have a little more of that yet to do. There will be some things left undone for the winter. Such as: Siding and interior furnishings. We just haven't been able to fund everything this season for three additional buildings.
We are still waiting on the , ever so efficient, IRS for the ruling on our 501c3 status.
There will be a few more entries with construction updates but the end is near for this season.
Temps are dropping into the 30's and snow is not all that far away.
We are still waiting on the , ever so efficient, IRS for the ruling on our 501c3 status.
There will be a few more entries with construction updates but the end is near for this season.
Temps are dropping into the 30's and snow is not all that far away.
Saturday, August 23, 2008
Just finishing up number three




Had nearly three days of thunderstorms,wind and rain so we got slowed down a bit but will still be done tomorrow with number three except for a few small cosmetic things.
We will now spend several days just cleaning up the three sites and doing some general beautification.
The three meditators; Mischa, Brendon and Terran should be in there respective Kutis by next tuesday. The work crew; Mischa and Brendon will probably continuing working for another week or two depending on what materials I can get purchased.
The IRS is now working on the 501c3 applications that were recieved in April of this year as was ours. We hope to hear from them very soon.
It was 39 degrees for a low temp two nights ago and I heard reports from the locals that there was some frost in the low lying valleys. We really haven't had much summer this year but yet I am looking forward to winter and all the snow.
I would like to say again how much I appreciate and how important to OGM the volunteers have been this summer. Without them we might have gotton one building done. As it is now we have four structures ready for the winter months. Also without Brians good help we would not be where we are today. He gets to spend far too little time here at OGM!
Wednesday, August 20, 2008
Porch railing and the roof


Porch railing went on yesterday and the roof got started but then the promised rain showed up and chased us off. Rain again today with temps in the 50's-60's. All in all a very pleasant change from the 100 degrees of the preceding few days. The thunder storms knocked out the Internet again yesterday so wasn't able to post until today. No work on the cabin today but did grade the road and the guys did some work in the Central Facility area getting ready to winterize it.
Monday, August 18, 2008
moving slow but moving forward

The heat and lack of funds has us moving slowly forward. The flying rafters went up today and tomorrow should see the sheathing on the main roof and the beginnings of the actual roofing. The weather forecast is for thunder storms and rain the next few days.....at least that will cool things down a bit.
Sunday, August 17, 2008
Saturday, August 16, 2008
Tuesday, August 12, 2008
Monday, August 11, 2008
Saturday, August 9, 2008
Been away for a few but the work continued.








I was entertaining family for a few days but the crew kept working.
Number 2 is dried in except for hanging the door which I will do tomorrow and then Mischa moves in.
Went out today and bought enough lumber to do the porch and framing on number three. The crew ( Mischa and Brendon ) and I put the porch on in under two hours, they're gettin' good, and then tomorrow will be the beginning of framing. Time us!!!!! we will have number three dried in by the 25th of August and then it will be time to put the siding on all three units and do the interiors ( if we can afford it )?
We are seriously movin' ahead now!!
Pictures today are of Number two and then several shots of the floor and porch of number three and then of the path the guys cut through the aspen grove to give access to the Central Facilities from number three.
Sunday, August 3, 2008
Saturday, August 2, 2008
Main roof is done
Friday, August 1, 2008
#2 porch roof goes on and veggies from the garden
Wednesday, July 30, 2008
Roof and stairs to the deck.


The "work crew" Mischa and Brendon put the sheathing on the roof today and have started the felt paper. Tomorrow is a shopping day to Spokane so they will get back to the roof on Friday. We are hoping to move Mischa into a "dried in" number two by mid next week.
The stairs also went in today...That was my contribution.
Tuesday, July 29, 2008
Rafters and flying rafters




Came up with a really easy way to put up the flying rafters.
Cut the slots in the two outside rafters, lay in the appropriate length support boards for the flying rafters. Place a 2x4 over the inside ends of these supports and clamp the 2x4 to the rafter thus sandwiching the supports between the two. The supports are only extended a few inches beyond the side wall, now install the flying rafter. Now slowly move the entire flying rafter out until you reach the proper measurement. Now screw down all of the supports where they are exposed before removing the clamps. Remove the clamps and fasten the rest of the supports.
No fuss no muss and it is totally adjustable so you can make sure you have the "EXACT" width roof you want to match the roof sheathing.
Sunday, July 27, 2008
ONWARD


Up go the loft walls and notice the new loft window configuration.
Also we are trying a new way of placing the roof rafters. Instead of bird mouth cutting each rafter twice we are going to use metal tie downs to secure the rafters. I think much faster and easier for those lacking in talent. (namely me!)
Saturday, July 26, 2008
Number two is moving along


Number two is now framed and sheathed on the first floor. The deck is now on and the steps and jump pad will go in tomorrow. Also tomorrow we will begin putting on the loft area and the roof. I hope to see this unit dried in by the end of the first week of August.
Mischa and Brendon are working very hard everyday and doing great work. I can see a major increase in their skill levels from the first day they were here. They have done most of the work on number two with only a minimal amount of supervision from me.
Friday, July 18, 2008
Number one shot gun shack nears completion



The number one shot gun shack is within a day of being ready to inhabit.
There are many cosmetic things yet to do but Brendon will move in and we will
finish later.
finish later.
The door is in as is the temp kitchen and the loft with access ladder.
We have now started on the deck/floor for number three so we can stack materials on it thus getting them out of our way in the shop.
We will have the floor done by Sunday and then will go full tilt for framing and drying in number two.
The summer weather is still great. Highs in the mid 80's and lows at night down to 50. Although it is beginning to get very dry.
Saturday, July 12, 2008
DRYING IN NUMBER 1





Brian has been gone for two days now and we are missing his help.
Mischa and Brendon have done the roofing on the first Shot Gun Shack with some small help from me. They did a Great job of it. We installed the tubular skylight and just need to get some ridge caps and the roof is complete. Two of the five windows are installed. The building is completely wrapped in felt ( tar paper ) it will be completely water proof when the other windows and door are installed.
Today's post will include pictures from the roofing process and three shots showing the visibility of this cabin from 100 ft then 75 ft and last from 50 feet away. Note that it is nearly invisible from 100 feet.
Brendon will be moving in by next wed/thur and going into full retreat. He gets the first "dried in" cabin (still unfinished inside) but that means he will get the last totally finished one.