Saturday, July 12, 2008

DRYING IN NUMBER 1




















Brian has been gone for two days now and we are missing his help.


Mischa and Brendon have done the roofing on the first Shot Gun Shack with some small help from me. They did a Great job of it. We installed the tubular skylight and just need to get some ridge caps and the roof is complete. Two of the five windows are installed. The building is completely wrapped in felt ( tar paper ) it will be completely water proof when the other windows and door are installed.


Today's post will include pictures from the roofing process and three shots showing the visibility of this cabin from 100 ft then 75 ft and last from 50 feet away. Note that it is nearly invisible from 100 feet.


Brendon will be moving in by next wed/thur and going into full retreat. He gets the first "dried in" cabin (still unfinished inside) but that means he will get the last totally finished one.

No comments: